It has been a long while since I updated on my house reno works.
This is going to be the 3rd week, the attempt by my nice and popular contractor uncle to speed up is futile when this HDB decided to hold the approval for like almost a month! Sigh...with that wall still there, not knowing to hack or not to hack, my tiling works has to come to a standstill. In other words, my tiling works has bottle necked!
Anyways, here are some of the updates of the pictures for the past few days.
The kitchen mosaics...not perfect, needs to be rectified.
hall tilings...white and I love the whiteness of it!
The common toilet on L1. Loved this feature wall.
My roller shutter at the bigger balcony.
Part of the kids' bathroom
The new wndows for all my toilets. WHite frames with tea-colored glass
Well, I also had some buys...bought the Grohe shower for the kiddos and Mom. This is gonna be their "luxury" during shower as they do not have a rain shower in the bathroom they share :)
My 2 basins...loved it!
For the kids
for MBR Toilet
The damage for the toilet fittings and all can esily set us back by more than $3k...not cheap leh...
No comments:
Post a Comment